Commercial ESS project supply

Commercial energy storage systems for EPC and C&I projects.

GINZA supplies commercial ESS cabinets and containerized ESS for project-based quotation, technical document review, export packing and EPC procurement workflows.

GINZA commercial energy storage system cabinet for EPC project supply
61.44kWh ESSGIB-60KP, 30kVA cabinet system
100.3kWh ESSGIB-100KP, 50kVA cabinet system
215kWh ESSAir / liquid cooling options
20-foot ESSContainerized project configuration

Confirmed ESS products

Commercial ESS cabinet and container options

Compare cabinet ESS for C&I projects with container ESS for larger project capacity and site configuration.

GINZA 20-foot container energy storage system

Containerized energy storage

GINZA 20-Foot Container ESS

20-foot container ESS for large project procurement, available in 1290kWh air-cooled and 3440kWh liquid-cooled configurations.

Energy
1290 / 3440kWh
Size
20ft
IP rating
IP54
View product data

Project comparison

Commercial ESS data for EPC quotation

Commercial ESS orders require project review. Use this table to compare capacity, output and configuration details before sending requirements.

Commercial ESS and container ESS comparison
ProductCore dataBest-fit buyerQuote basisProduct details
61.44kWh Commercial ESSEnergy: 61.44kWh | Output: 30kVA | Model: GIB-60KPEPC, commercial projects, project distributorsProject requirement reviewView product
100.3kWh Commercial ESSEnergy: 100.3kWh | Output: 50kVA | Model: GIB-100KPEPC, commercial projects, project distributorsProject requirement reviewView product
215kWh ESS CabinetEnergy: 215 / 220.5kWh | Output: 100kVA | Cooling: Air / liquidEPC, commercial projects, industrial storageProject configuration reviewView product
20-Foot Container ESSEnergy: 1290 / 3440kWh | Size: 20ft | IP rating: IP54Utility, C&I, EPC project procurementProject requirement reviewView product

EPC review scope

Information GINZA needs before a commercial ESS offer

A useful commercial ESS quote should be based on project capacity, PCS plan, cooling preference, installation environment and documentation requirements.

Energy and power

Target kWh, kW/kVA, backup duration and expected operating mode.

Site conditions

Indoor or outdoor plan, ambient conditions, spacing and access requirements.

Integration

PV, grid, load, inverter or PCS requirements for project configuration review.

Documents

Datasheets, certificates, drawings, packing and shipping information for EPC files.

Certificates and export

Documentation matters for B2B ESS procurement

Commercial ESS buyers usually need more than a price. GINZA can prepare technical documents, certificate references and export packing details for review.

UN38.3Transport documentation for battery shipment review.
MSDSMaterial safety documentation for logistics and buyer files.
IEC / CEProject certificate files where applicable by product and market.
Packing dataCabinet packing, container planning and destination port review.

Project proof

Factory, QC and project reference media

Factory, QC and project reference images help buyers review engineering supply, export packing and real project handling.

GINZA high voltage commercial ESS cabinet
High-voltage commercial ESS reference
GINZA LiFePO4 battery final inspection before shipment
Final inspection before shipment
GINZA commercial solar battery installation reference
Commercial battery installation reference

FAQ

Commercial ESS buyer questions

These answers help EPC and commercial buyers prepare project quotation details.

Define the service before choosing a cabinet. Use the peak shaving worksheet for demand limits, the critical-load backup worksheet for outage requirements and the zero-export checklist for metering and commissioning.

For controls integration, use the BESS control responsibility guide to specify who owns dispatch, battery limits, converter response and meter feedback.

Ask bidders for auxiliary energy by operating state for the expected duty schedule. If the site must restore a de-energized bus, use the black-start requirements guide to define the starting condition and witness evidence.

Compare the cooling configuration and PCS kW and kVA capability, then agree the factory and site acceptance scope with the quotation.

What commercial ESS information is needed before quotation?

Share energy capacity, power requirement, installation environment, cooling preference, grid or PV integration plan, destination country and required technical documents.

Can GINZA quote a commercial ESS as part of a wider PV project BOM?

Yes. GINZA can review ESS cabinets together with solar panels, low-voltage batteries, cables, inverters, mounting and distribution boxes for EPC procurement.

Can 215kWh cabinet ESS and container ESS be compared for one project?

Yes. For larger projects, GINZA can compare cabinet and containerized ESS options based on target capacity, site layout, PCS plan, shipment and documentation requirements.

Commercial ESS inquiry

Send project capacity, output requirement and destination port

The more project context you share, the faster GINZA can review model fit, configuration, documentation and export packing.

EPC quotation support

Commercial ESS quote should start from project data

Share project capacity, PCS plan, site environment and required certificates before asking for a final commercial offer.

Fields marked * are required. You can start with the information you have; delivery and technical details can be added below.

At least 20 characters. Include your question, quantity or intended application.

Delivery and technical details (optional)

Protected by Cloudflare Turnstile. Your details are sent securely to GINZA.

Have a BOM, drawing or datasheet to attach? Email [email protected].

WhatsApp